WINN ARMY COMMUNITY HOSPITAL ADDITIONS / ALTERATIONS PHASE I

Fort Stewart, GA
Square Footage: 65,000 SF
Cx Cost: $22,610.00
Project Value: $27M
Completion Date: August 2015

Clinical additions and alterations to Winn Army Hospital, Ft. Stewart, GA. Primary facilities include a 65,000 square feet addition and 1,000 square feet alteration to the hospital as well as building information systems. Sustainable Design and Development (SDD) and the Energy Policy Act of 2005 (EPAct 2005) was included. Phasing plan required the existing facility to be open and completely operational during repairs. Complete renovation of the Central Energy Plant, including chillers, cooling towers, controls, pumps, etc.

TSCx commissioned the following systems:

• Building Automation System

• Chillers

• Cooling Tower

• Air Handling Units

• Fan Coil Units

• Split System Air Conditioners

• Dedicated Outdoor Air Units

• Air Terminal Units

• Hot Water Converter

• Emergency Power System

• Exhaust Fans

• Domestic Hot Water System

• Switchboards

• Pumps

• UPS System

• Panelboards

• Fire Alarm System

• Test & Balance Reports

• Communications Room Air Conditioners

• Lighting Controls

• Lightning Protection

• Fire Damper Inspection

• Pressure Duct System

• Boilers

• Copper-Silver Ionization System

• Building Pressurization

• Electrical Systems

• HVAC System

OWNER: U.S. Army Corps of Engineers, Savannah District ♦ William Weaver – 912.652.5279 – william.m.weaver@usace.army.mil

GENERAL CONTRACTOR: McCarthy Building Company, Inc. ♦ Jeff Lake – 404.456.3079 – jlake@mccarthy.com

ARCHITECT: Leo A. Daly