GSE FACILITY RELOCATION
Delta Air Lines
Atlanta, GA
Square Footage: 30,000 SF
Cx Cost: $38,850.00
Completion Date: June 2020
Owner’s Satisfaction Level: Satisfied
Maintenance complex for Delta’s fleet of service vehicles. Including an 8-bay Maintenance Building, a 3-bay Wash Facilityusing recycled water and a Fueling Station.
TSCx commissioned the following systems:
• Building Automation System
• Energy Recovery Units
• Rooftop Units
• Split System Units
• Gas Fired Infrared Unit Heater
• Gas Fired Unit Heater
• Exhaust Fans
• Fuel System
• Welding Exhaust
• Domestic Water
• Domestic Water Heating
• Compressed Air
OWNER: Delta Air Lines
OWNER’S REPRESENTATIVE: PM Technologies
ARCHITECT: Prime Engineering, Inc.
CONTRACTOR: Dunn Works, A JE Dunn Construction Joint Venture ♦ Nick Christoffersen – 404.391.3588
• Fire Alarm
• Electrical Power
• Wash System
• Triturator
• Testing, Adjusting & Balancing Report